您可通過問題反饋或聯繫在線客服提交您的建議,我們將盡快完善:
Support
確定
??
不支持第三方 Cookie
您的瀏覽器不允許設置第三方 cookie。Please enable them in your browsers settings or click the button below.
請單擊此處在新選項卡中打開頁面內容。
If the opened page does not work initially, try reloading the page.
Please enable cookies in your browser for PARTcommunity to work
Catalog navigation
可提供的產品目錄語言:
Deutsch
English
español
français
italiano
português
svenska
中文
中文 (繁體)
中文 (繁體)
QA認證資訊
目錄: Ewellix
Created: 28.10.2013
產品目錄的特殊屬性:
利用CADENAS质量管理工具 PARTproject QA进行集中管理
Electronic test run was passed (CAD compatibility assured)
只包含唯一性 -> 完整的ERP-匹配性
Ewellix
SL 25x20R 68/68 G5 AA NOWPR
Ewellix
Ball & Roller Screws
Ball Screws
Powered by
下載CAD模型
生成CAD模型
生成PDF資料表
Previews
3D
2D
CAD模型選擇
{ewellix/ball_and_roller_screws/precision_ball_screws/sl_slt_asmtab.prj},{NB=SL 25x20R 68/68 G5 AA NOWPR},{COMP=Ewellix},{DESC=Long lead and rotating nut ball screws},{SERIES=SL-SLT},{TP=SL},{NDL=25x20},{HND=Right},{THDL=68.000},{MEC=AA},{REQLR=0.000},{REQLL=0.000},{NORT=},{KW=},{WP=NOWPR},{LP=G5},{MAXP1=0.08},{RPR=0.05},{TPR1=0.01-0.22},{NOCB=4x1.7},{NI=480},{NG=3.0},{NW=0.57},{SM=3.30},{SI=215.0},{SG=3.4},{L8A=0},{PPATH=parts/sl_slt_parts/sl_slt_asmtpl.prj}
請根據技術需求選擇所需產品. 可選屬性在表格中高亮顯示. 選擇可以通過點擊表格或數值來重置.
可提供的產品: 1
HELP_VARIABLE
公司
Ewellix
描述
SL-SLT - Long lead and rotating nut ball screws
明細表
SL 25x20R 68/68 G5 AA NOWPR
COMP
Company
Ewellix
DESC
Description
Long lead and rotating nut ball screws
PN
Ordering key
SL 25x20R 68/68 G5 AA NOWPR
SERIES
SL-SLT
TP
TYPE
SL - Long lead ball screw
SLT - Rotating nut
SLD - Long lead screw, axial play, DIN nut
SL - Long lead ball screw
SLT - Rotating nut
SLD - Long lead screw, axial play, DIN nut
NTP
Nut Type
Precision screw, axial play
NDL
Nominal diameter x Lead
25x20
25x25
32x20
32x32
32x40
40x20
40x40
50x50
25x20
25x25
32x20
32x32
32x40
40x20
40x40
50x50
mm
HND
Hand
Right
THDL
Threaded length
mm
Enter value for THDL
Threaded length
mm
cm
inch
ft
確定
MEC
Machined end combination
Cut only (without length indication)
Type 1A + Type 2A end machining
Type 2A + Type 2A end machining
Type 2A + Type 3A end machining
Type 2A + Type 4A end machining
Type 2A + Type 5A end machining
Type 3A + Type 5A end machining
End machined to root diameter d2, any length
End machined to diameter d3 under induction hardening, any length
End machined according to customer drawing on request
Cut only (without length indication)
Type 1A + Type 2A end machining
Type 2A + Type 2A end machining
Type 2A + Type 3A end machining
Type 2A + Type 4A end machining
Type 2A + Type 5A end machining
Type 3A + Type 5A end machining
End machined to root diameter d2, any length
End machined to diameter d3 under induction hardening, any length
End machined according to customer drawing on request
REQLR
Required length for end machining right side
0.000
0.000
NORT
Nut orientation
Not Available
Not Available
KW
Keyway
Not Available
Not Available
WP
Wiper
w/o Wipers
Wipers in the nut
w/o Wipers
Wipers in the nut
LP
Lead precision
G5
G7
G9
G5
G7
G9